When the builder was doing our garage we had to buy the dried ballest they call it just mix with sand or cement I can't remember what, but every time a ton was delilvered to us it cost !73lev which included 35lev transport and we had 12+ loads delivered so it might be cheaper in the long run to get it ready mixed.